M6 Traffic near Stafford

ABM
ABM Forum Participant Posts: 14,578
1000 Comments
edited March 2019 in Caravan & Motorhome Chat #1

M6  will  be  CLOSED  from  approx  17:00  Saturday  23rd March  until  some  time  Sunday  morning  24th ,  to  allow  the  removal  of  a  BRIDGE  for  Smart  Motorway  Work.

DIVERSIONS  are  thro  STAFFORD  !!

Comments

  • JillwithaJay
    JillwithaJay Club Member Posts: 2,485 ✭✭
    500 Likes 1000 Comments
    edited March 2019 #2

    Thanks ABM.  I've added a little more information to help anybody going that way.  

    Aren't I the lucky one as I came through there yesterday.  smile

    QUOTE:

    Burton Bank footbridge demolition

    Following the successful demolition of Creswell Home Farm bridge in September last year, we will now be demolishing Burton Bank footbridge between junctions 13 and 14. 

    Currently, there isn’t enough headroom for heavy goods vehicles between the hard shoulder and existing footbridge to allow for all lane running. We need to demolish the footbridge to create the additional headroom required.

    The bridge demolition is scheduled to take place overnight from Saturday 23 March to Sunday 24 March 2019. We will need to close 2 lanes in each direction of the M6 between junctions 13 and 14 from 5pm Saturday 23 March before completely closing the motorway at 8pm. (Please note - dates and times are subject to change. please check the Roadworks tab below for details).

    The demolition could take up to 18 hours however we are hoping to reopen the motorway sooner than this. 

    We will be advertising the closure on electronic variable message signs on the motorway network, from as far as Dover to Carlisle. We will be using these to warn drivers to expect delays on the M6 and advising that they avoid the area and use alternative routes where possible. 

    The bridge weighs 143 tonnes and we will demolish it using two large machines that will munch through the structure. We will put a large safety mat over the carriageway to prevent any damage to the road surface during the demolition. We will take any debris off-site straight away to a nearby compound, reducing the time needed for the motorway closure and the use of site vehicles on local roads.
    We would like to thank motorists and residents in advance for their patience during this work.

    Please visit @HighwaysWMIDS on Twitter for live updates during the demolition weekend.

  • ABM
    ABM Forum Participant Posts: 14,578
    1000 Comments
    edited March 2019 #3

    Thanks  Jill

  • ABM
    ABM Forum Participant Posts: 14,578
    1000 Comments
    edited March 2019 #4

    All  was  restored  to  normal  by  07:30  today  ==  Several  hours  early surprised !!  I  would  have  posted  this  sooner  but  i  felt  in  urgent  need  of  a  lie  down  &  restorative  drink  on  hearing  that  innocent!!

  • JillwithaJay
    JillwithaJay Club Member Posts: 2,485 ✭✭
    500 Likes 1000 Comments
    edited March 2019 #5

    I heard Sally Traffic on Radio 2 mention it earlier today.  I'll now close the thread as it was for information only but thanks again ABM.